Environmental Documents

Site Plan Review 22-013 and Tentative Parcel Map 83915


  1. SPR 22-013 TPM 83915 FEIR
  2. SPR 22-013 TPM 83915 Notice of Availability of FEIR
  3. SPR 22-013 TPM 83915 Notice of Availability
  4. SPR 22-013 TPM 83915 Draft Environmental Impact Report
  5. SPR 22-013_TPM 83915 Appendix A - NOP and Written Comments on the NOP
  6. SPR 22-013_TPM 83915 Appendix B1 - Air Quality Impact Analysis
  7. SPR 22-013_TPM 83915 Appendix B2 - Mobile Source Health Risk Assessment
  8. SPR 22-013_TPM 83915 Appendix B3 - Palmdale Logistics Park Site Plan Review
  9. SPR 22-013_TPM 83915 Appendix C1 -Biological Technical Report
  10. SPR 22-013_TPM 83915 Appendix C2 - Special Status Desert Native Plant Survey
  11. SPR 22-013_TPM 83915 Appendix C3 - Swainson's Hawk Survey
  12. SPR 22-013_TPM 83915 Appendix C4 - Burrowing Owl Survey
  13. SPR 22-013_TPM 83915 Appendix C5 - Jurisdictional Delineation Report
  14. SPR 22-013_TPM 83915 Appendix C6 - Habitat Assessment for MGS
  15. SPR 22-013_TPM 83915 Appendix C7 - MGS Protocol Survey
  16. SPR 22-013_TPM 83915 Appendix C8 - Joshua Tree Report
  17. SPR 22-013_TPM 83915 Appendix C9 - Desert Tortoise Survey Report
  18. SPR 22-013_TPM 83915 Appendix D - Cultural Resources Investigation
  19. SPR 22-013_TPM 83915 Appendix E - Energy Analysis
  20. SPR 22-013_TPM 83915 Appendix F1 - Geotechnical Investigation
  21. SPR 22-013_TPM 83915 Appendix F2 - Results of Infiltration Testing
  22. SPR 22-013_TPM 83915 Appendix G - Paleontological Resources Technical Memorandum
  23. SPR 22-013_TPM 83915 Appendix H - Greenhouse Gas Emissions
  24. SPR 22-013_TPM 83915 Appendix I - Phase I Environmental Site Assessment
  25. SPR 22-013_TPM 83915 Appendix J1 - Hydrology Report
  26. SPR 22-013_TPM 83915 Appendix J2 - Preliminary Low Impact Development Report
  27. SPR 22-013_TPM 83915 Appendix K - Noise and Vibration Analysis
  28. SPR 22-013_TPM 83915 Appendix L1 - Traffic Analysis Scoping Agreement
  29. SPR 22-013_TPM 83915 Appendix L2 - Traffic Analysis
  30. SPR 22-013_TPM 83915 Appendix L3 - Vehicle Miles Traveled Analysis
  31. SPR 22-013_TPM 83915 Appendix L4 - Supplemental Vehicle Miles Traveled Analysis
  32. SPR 22-013_TPM 83915 Appendix M1 - Sanitary Sewer Analysis
  33. SPR 22-013_TPM 83915 Appendix M2 - Water Supply Assessment

Environmental Documents for Review

  1. CUP 17-012 Major Mod No. 1 - Draft Initial Study Quikrete
  2. TPM 84099 Mitigated Negative Declaration and Initial Study (PDF)
  3. TPM 84077-CUP 23003-SPR 23001-Initial Study (PDF)
  4. TPM 84077-CUP 23003-SPR 23001-Initial Study Appendix a (PDF)
  5. TPM 84077-CUP 23003-SPR 23001-Initial Study Appendix b (PDF)
  6. TPM 84077-CUP 23003-SPR 23001-Initial Study Appendix c (PDF)
  7. TPM 84077-CUP 23003-SPR 23001-Preparation (PDF)
  8. Appendix C3 - Blainvilles Horned Lizard Survey (PDF)
  9. Appendix M2 - Water Supply Assessment (PDF)
  10. Appendix M1 - Sanitary Sewer Analysis (PDF)
  11. Appendix L4 - Railroad Safety Evaluation (PDF)
  12. Appendix L3 - Supplemental VMT Analysis (PDF)
  13. Appendix L2 - Vehicle Miles Traveled Analysis (PDF)
  14. Appendix L1 - Traffic Analysis Scoping Agreement (PDF)
  15. Appendix K - Noise and Vibration Analysis (PDF)
  16. Appendix J2 - Preliminary LID Report (PDF)
  17. Appendix J1 - Preliminary Hydrology Report (PDF)
  18. Appendix I - Phase I Environmental Site Assessment (PDF)
  19. Appendix H - Greenhouse Gas Emissions (PDF)
  20. Appendix G - Paleontological Resource Report (PDF)
  21. Appendix F - Geotechnical Investigation (PDF)
  22. Appendix E - Energy Analysis (PDF)
  23. Appendix D - Cultural Resource Investigation (PDF)
  24. Appendix C5 - Jurisdictional Delineation Report (PDF)
  25. Appendix C4 - Burrowing Owl Survey (PDF)
  26. Appendix C2 - Special Status Desert Native Plant Survey (PDF)
  27. Appendix C1 - Biological Technical Report (PDF)
  28. Appendix B2 - Mobile Source Health Risk Assessment (PDF)
  29. Appendix B1 - Air Quality Impact Analysis (PDF)
  30. Appendix A - NOP and Written Comments on the NOP (PDF)
  31. Appendix A - Air Quality Study Quikrete Concrete Bagging and Pavers Manufacturing Plant
  32. Appendix F - Acoustical Analysis Quikrete
  33. Appendix C - Phase 1 Cultural Resources Assessment of Quikrete Plant Project
  34. Appendix B - Biological Habitat Assessment for Quikrete
  35. Appendix G - Trip Generation Memorandum for the Quikrete Plant Project
  36. Appendix E - Phase 1 Envionrmental Site Assessment
  37. Appendix D - Geotechnical Engineering Report